欢迎您光临江南游戏网址 网站!
联系江南游戏网址 / Contact us

江南游戏网址

客户咨询热线

0531-85767688

售后热线:15668327566

联系基地:山东省 德州市协同发展产业园D06幢

当前位置: 首页> 新闻中心> 常见问题

桥架施工完成后的检验应包括几个方面

文章来源://www.comprepyme.com/作者:电缆桥架厂家发布时间:2023-04-18浏览次数:15

返回: 常见问题
桥架是道路、铁路、电力、通信等工程建设中常用的一种横跨设施,因其涉及到人们的出行和安全,所以桥架的施工完成后的检验至关重要。 济南电缆桥架施工完成后的检验应包括以下几个方面:
Bridge is a commonly used crossing facility in road, railway, power, communication and other engineering construction. As it involves people's travel and safety, the inspection of the bridge after construction is crucial. The inspection after the construction of cable tray in Jinan shall include the following aspects:
1.桥架的尺寸检验:应根据施工图纸的要求,对桥架的长度、宽度、高度、斜度进行测量,并与设计尺寸进行对比。如果存在偏差,需要进行修整。
1. Dimensional inspection of the bridge: The length, width, height, and slope of the bridge should be measured according to the requirements of the construction drawings, and compared with the design dimensions. If there is a deviation, it needs to be repaired.
2.桥架的垂直度检验:桥架的垂直度对桥架的承载能力和使用寿命有着很大的影响。检验时可以使用水平仪等工具进行测量,确保桥架垂直度符合标准要求。
2. Verticality inspection of the bridge: The verticality of the bridge has a significant impact on the bearing capacity and service life of the bridge. During inspection, tools such as a level gauge can be used for measurement to ensure that the verticality of the bridge meets the standard requirements.
3.桥架的横向和纵向水平度检验:这是衡量桥架水平度的另一个重要指标。可以使用水平仪或光纤陀螺仪等工具进行测量。
3. Horizontal and vertical levelness inspection of the bridge: This is another important indicator to measure the levelness of the bridge. Measurements can be made using tools such as a level gauge or fiber optic gyroscope.
济南电缆桥架
4.桥架的平面度和平直度检验:这是检测桥架平面和平直程度的指标。可以使用测量仪器或绳子等进行测量,确保桥架平面度和平直度符合标准要求。
4. Flatness and straightness inspection of the bridge: This is an indicator for detecting the flatness and straightness of the bridge. Measurement instruments or ropes can be used to ensure that the flatness and straightness of the bridge meet the standard requirements.
5.桥架的承载能力和安全性检验:施工完成后,应进行桥架的承载能力和安全性检验。可以进行静载试验或动载试验,检测其承载能力是否符合标准要求,同时还需要检查桥架的连接件、防腐保护等,确保桥架的安全性。
5. Bearing capacity and safety inspection of the bridge: After the construction is completed, the bearing capacity and safety inspection of the bridge should be carried out. Static or dynamic load tests can be conducted to check whether its load-bearing capacity meets the standard requirements. At the same time, it is also necessary to check the connections and anti-corrosion protection of the bridge to ensure the safety of the bridge.
总之,桥架施工完成后的检验是确保桥架质量和安全的关键步骤。需要在施工过程中,保证施工标准和质量,并在施工完成后进行全面的检验。更多相关疑惑或者需求,就来我们网站 //www.comprepyme.com咨询吧!
In short, the inspection after the completion of bridge construction is a key step to ensure the quality and safety of the bridge. It is necessary to ensure construction standards and quality during the construction process, and conduct comprehensive inspections after the construction is completed. For more related doubts or needs, come to our website //www.comprepyme.com Consult!
工程案例 / Case Show
  • 济南火车站济南火车站
  • 曲阜孔子文化会展中心曲阜孔子文化会展中心
  • 山东工艺美院山东工艺美院
  • 公安厅服务展示公安厅服务展示
推荐资讯 / Recommended news
  • 槽式电缆桥架安装高度为什么有标准?槽式电缆桥架安装高度为什么有标准?

    电缆的散热效果:在电缆的运行过程中,会产生一定的热量。如果桥架安装高度过低,可能会导致电缆的散热效果不佳,从而使电缆过热,引发火灾等安全事故。因此,在安装桥架时,应确保其高度能够使电缆保持良好的散热状

    TIME:2024-01-22
Baidu
map