桥架的固定支点设置要注意什么?

文章来源://www.comprepyme.com/作者:电缆桥架厂家发布时间:2023-07-05浏览次数:7

返回: 常见问题
桥架在进出接线盒、箱、柜、转角、转弯和变形缝两端及丁字接头的三端500mm以内应设固定支持点。严禁用电气焊切割支吊架;严禁用木砖固定支、吊架。
Fixed support points should be set up within 500mm of the entry and exit junction boxes, boxes, cabinets, corners, turning and deformation joints, as well as the three ends of the T-joint of the bridge bridge. It is strictly prohibited to use electrical welding to cut supports and hangers; It is strictly prohibited to use wooden bricks to fix supports and hangers.
桥架在进出接线盒、箱、柜、转角、转弯和变形缝两端及丁字接头的三端500mm以内应设固定支持点。严禁用电气焊切割支吊架;严禁用木砖固定支、吊架。
Fixed support points should be set up within 500mm of the entry and exit junction boxes, boxes, cabinets, corners, turning and deformation joints, as well as the three ends of the T-joint of the bridge bridge. It is strictly prohibited to use electrical welding to cut supports and hangers; It is strictly prohibited to use wooden bricks to fix supports and hangers.
桥架安装
Bridge installation
4.1桥架水平安装时,支撑跨距一般为1.5—3m,垂直敷设时固定点间距不易大于2m。
When the cable tray is installed horizontally, the support span is generally 1.5-3m, and the spacing between fixed points is not more than 2m when laid vertically.
4.2桥架应平整,无扭曲变形,内壁无毛刺,各种附件齐全
4.2 The bridge should be flat, without distortion or deformation, with no burrs on the inner wall, and all accessories complete
4.3桥架接口应平整,接缝处应紧密平直。槽盖装上后应平整,无翘角,出线口的位置准确。
4.3 The bridge interface should be flat, and the joints should be tight and straight. After installing the slot cover, it should be flat, without any warping angles, and the position of the outlet should be accurate.
4.4在吊顶内敷设时,如果吊顶无法上人时应留有检修孔。
4.4 When laying inside the suspended ceiling, if it is not possible to access people, an access hole should be left.
4.5桥架的所有非导电部分的铁件均应相互连接和跨接,使之成为一连续导体,并做好整体接地;每段桥架之间的接地跨接采用编织铜线。
4.5 All non conductive parts of the bridge should be interconnected and bridged to form a continuous conductor, and the overall grounding should be done; The grounding jumper between each section of the bridge is made of braided copper wire.
山东电缆桥架
4.6桥架经过建筑物的变形缝时,桥架本身应断开,槽内用连接板搭接,不需固定。保护地线和槽内导线应留有补偿余量。直线段钢制桥应认真执行施工规章制度加强对施工人员管理,落实施工技术措施,检查和督促施工人员作业,做到、文明施工。
4.6 When the bridge passes through the deformation joint of the building, the bridge itself should be disconnected, and the groove should be overlapped with a connecting plate without the need for fixation. Compensation allowance should be left for the protective ground wire and the wire in the slot. Straight section steel bridges should conscientiously implement safety construction rules and regulations, strengthen the management of construction personnel, implement safety construction technical measures, inspect and supervise the safe operation of construction personnel, and achieve safe and civilized construction.
1.2组织施工人员学习施工标准和熟悉施工图纸,严格按照设计及有关规定、规范、标准要求进行施工,随时检查施工质量,发现问题及时整改。
1.2 Organize construction personnel to learn construction standards and familiarize themselves with construction drawings, strictly follow the design and relevant regulations, specifications, and standard requirements for construction, inspect construction quality at any time, and promptly rectify any problems found.
1.3对施工现场搭设脚手架、并架和施工现场使用的电气、机械设备、防护装置应符合相关规定并验收合格后才能使用。施工人员在整个施工过程中应遵守下列规定:
1.3 The electrical, mechanical equipment, and safety protection devices used on the construction site should comply with relevant safety regulations and be inspected and accepted before use. Construction personnel should comply with the following regulations throughout the entire construction process:
2.1必须遵守和执行相关的生产、文明施工的管理制度并应接受建设单位监理人员的检查监督。必须戴帽进入施工现场,高空作业必须系好带。
2.1 It is necessary to comply with and implement relevant management systems for safety production and civilized construction, and accept the inspection and supervision of the construction unit's supervisory personnel. Safety helmets must be worn when entering the construction site, and safety belts must be fastened when working at heights.
2.3在控制室、开关室工作必须要有监护人员在场,并在断电的情况下进行作业,应摘下手表、钥匙、打火机、钢笔等金属物品,并戴绝缘手套,穿绝缘鞋。
2.3 When working in the control room and switch room, a supervisor must be present and work must be carried out in the event of a power outage. Metal items such as watches, keys, lighters, pens, etc. should be removed, and insulated gloves and shoes should be worn.
2.4需要整理排放电缆时,事前应征求监护人员的同意,并在监护人员监护下进行。
When it is necessary to arrange and discharge cables, the consent of the supervisor should be sought in advance and carried out under the supervision of the supervisor.
2.5施工完毕后,应将施工现场清理干净。
2.5 After the construction is completed, the construction site should be cleaned up.
施工管理制度
Safety Construction Management System
1、进出工作区域一定要登记时间、人数和工作内容。
1. It is necessary to register the time, number of people, and work content when entering and exiting the work area.
2、施工人员进场施工要佩戴工作胸卡,头戴帽,身穿工作服。
2. Construction personnel entering the construction site must wear work badges, safety helmets, and work clothes.
3、进入工作区域施工,严禁吸烟。
3. Smoking is strictly prohibited when entering the work area for construction.
4、带电操作区域必须允许工作时,穿戴绝缘手套和绝缘鞋。
4. When working in live working areas, it is necessary to wear insulated gloves and shoes.
本文由 山东电缆桥架友情奉献.更多有关的知识请点击: //www.comprepyme.com真诚的态度.为您提供为的服务.更多有关的知识我们将会陆续向大家奉献.敬请期待.
This article is dedicated by Shandong Cable Bridge Friendship. For more relevant knowledge, please click on: //www.comprepyme.com Sincere attitude. We will provide you with comprehensive services. We will gradually contribute more relevant knowledge to everyone. Stay tuned
工程案例 / Case Show
  • 济南火车站济南火车站
  • 曲阜孔子文化会展中心曲阜孔子文化会展中心
  • 山东工艺美院山东工艺美院
  • 公安厅服务展示公安厅服务展示
资讯 / Recommended news
  • 保护,防火式电缆桥架为您筑就防线保护,防火式电缆桥架为您筑就防线

    在现代建筑和工业设施中,电缆的布线和管理是一个关重要的任务,而防火式电缆桥架则成为保护的关键。这种创新的装置不仅能够支持电缆的布置,还能有效地防止火灾的蔓延,为人们的生命和财产提供强大的

    TIME:2024-03-31
Baidu
map