1.电缆桥架设备平衡气缸动作状况及其机油润滑系统油路,接头等测试检查.
1. Test and check the operation condition of balance cylinder of cable bridge equipment and the oil circuit and joint of oil lubrication system
2.电缆桥架设备滑块与导轨之间的摩擦较为频繁,应做必要的调整较正,检查接头部位的润滑优良及管路等,保证良好的运转。
2. The friction between sliding block and guide rail of cable bridge equipment is frequent, so necessary adjustment should be made, and the lubrication of joint and pipeline should be checked to ensure good operation.
3.定期为电缆桥架设备齿轮部位润滑:齿轮传动箱及内部机件因为经常运转损坏的可能性比较大,出现松动的可能性更大。当这些部位出现噪音后,可先对此进行润滑,然后根据振动情况,检查系统之间的的注油点的吐油量和压力测试,进行适当的调整。
3. Regularly lubricate the gear parts of cable bridge equipment: the gear box and internal parts are more likely to be damaged due to frequent operation, and more likely to be loose. When there is noise in these parts, it can be lubricated first, and then according to the vibration situation, check the oil discharge amount and pressure test of the oil filling points between the systems, and make appropriate adjustment.
4.动荷载是指电缆电缆桥架安装和维护过程中,施工维修人员的重量。对于轻型电缆电缆桥架,一般不考虑动荷载,即不允许在电缆桥架上站人,如果需要考虑站人,则应将跨距适当缩小。
4. Dynamic load refers to the weight of construction and maintenance personnel in the process of cable bridge installation and maintenance. For the light cable bridge, the dynamic load is generally not considered, that is, people are not allowed to stand on the cable bridge. If people need to be considered, the span should be appropriately reduced.
5.静荷载是指敷设在电缆电缆桥架内的电缆种类、根数、每根的外径重量/单位长度,按电缆敷设的不同路由分别列表统计。
5. Static load refers to the type, number, outer diameter weight / unit length of each cable laid in the cable tray, which is listed and counted according to different routes of cable laying.
6.附加荷载仅在室外是指冰雪、风和电磁力所形成的荷载,它与安装场所的地区自然气象条件和带电体的性质有关,设计中应根据各种条件加以计算。
6. The additional load only refers to the load formed by ice, snow, wind and electromagnetic force outdoors, which is related to the natural meteorological conditions of the installation site and the nature of the charged body, and should be calculated according to various conditions in the design.
Thank you for reading, hope the above content is helpful to you, if you want to know more wonderful content, please click our official website: Shandong cable bridge //www.comprepyme.com .